Job regulations of the chief engineer in construction. Job description of the chief engineer for construction. Job Responsibilities of a Chief Engineer in a Construction Company


Provides the availability of all the necessary information for the development of design estimates and materials for construction projects. 2.8. Provides control over compliance with the requirements of the legislation on protection environment, as well as technical supervision and control over the timing and quality of all construction and installation and other construction works, for their compliance with the approved design and estimate documentation, building codes, rules, standards and specifications, safety standards, industrial sanitation and fire protection, labor organization requirements. 2.9. Coordinates with the bodies exercising technical supervision on issues related to the installation, testing and registration of equipment at construction sites. 2.10.

Job description of the chief construction engineer

Give instructions to subordinate employees and services, tasks on a range of issues included in his functional responsibilities. 3.2. To control the fulfillment of planned tasks and works, the timely execution of individual orders and tasks by subdivisions subordinate to him. 3.3. Request and receive necessary materials and documents related to the activities of the Chief Engineer for Construction, subdivisions subordinate to him.
3.4.

Enter into relationships with departments of third-party institutions and organizations to resolve operational issues of production activities that are within the competence of the Chief Construction Engineer. 4. RESPONSIBILITIES The Chief Construction Engineer is responsible for: 4.1. The results and efficiency of the production activities of the enterprise within its competence.


4.2.

Job Descriptions

Sign and endorse documents within their competence. 4.3. Initiate and hold meetings on production, economic and financial and economic issues. 4.4. Request and receive from structural divisions necessary information and documents.
4.5.

Attention

Conduct quality and timeliness checks on assignments. 4.6. Demand the termination (suspension) of work (in case of violations, non-compliance with established requirements, etc.), compliance with established norms, rules, instructions; give instructions for correcting deficiencies and eliminating violations. 4.7. Submit to management construction organization ideas about the admission, transfer and dismissal of employees, about the encouragement of distinguished employees and about the application disciplinary actions to employees who violate labor and production discipline.


4.8.

Require the management of the organization to provide assistance, including the provision of organizational and technical conditions and the execution of established documents necessary for the performance of official duties. 6. Other rights established by the current labor law. 4. Responsibility of the chief engineer The chief engineer is responsible in the following cases: 1.

Per improper execution or failure to fulfill their official duties provided for by this job description - within the limits established by labor legislation Russian Federation. 2. For offenses committed in the course of their activities - within the limits established by the current administrative, criminal and civil legislation of the Russian Federation. 3.

Job description of the chief engineer in construction

You can download the job description of the chief construction engineer for free. Job Responsibilities chief engineer for construction I approve (Last name, initials) (name of the organization, its organizational - legal form) (director; other person authorized to approve the job description) 00.00.201_g. m.p. JOB INSTRUCTIONS OF THE CHIEF CONSTRUCTION ENGINEER (name of institution) 00.00.201_g.


№00 1. General provisions 1.1.Real job description defines the rights, responsibilities and duties of the chief construction engineer (hereinafter referred to as the "enterprise"). Name of the institution 1.2. The chief construction engineer is hired and dismissed in accordance with the procedure established by the current labor legislation by order of the director of the enterprise. 1.3. The chief construction engineer is subordinate to the director of the enterprise.

Job description of the chief construction engineer

Info

The chief construction engineer is guided in his activities by:- legislative acts of the Russian Federation; - the Charter of the enterprise, the Rules of internal labor regulations, others regulations company; - orders and instructions of the management; - this job description. 2. Functional duties of the chief construction engineer The chief construction engineer performs the following duties: 2.1. Ensures the execution of construction works, targeted and rational use resources.2.2.


Leads the work to improve and reduce the cost of design and survey work, improve the organization of production and introduce progressive construction methods, reduce the cost of construction work and improve quality, as well as reduce the time for their implementation.2.3.

Job description of the chief engineer of a construction organization

Determines the technical policy and directions of the technical development of the enterprise in a market economy, the ways of reconstruction and technical re-equipment of the existing production, the level of specialization and diversification of production in the future. 2. Provides the necessary level technical training production and its constant growth, increasing the efficiency of production and labor productivity, reducing costs (material, financial, labor), rational use of production resources, high quality and competitiveness of products, works or services, compliance of manufactured products with current state standards, technical conditions and requirements of technical aesthetics, as well as their reliability and durability. 3.

Job description of the chief engineer

To give instructions to subordinate employees and services, tasks on a range of issues included in his functional duties. 3.2. To control the fulfillment of planned tasks and works, the timely execution of individual orders and tasks by subdivisions subordinate to him. 3.3. Request and receive the necessary materials and documents related to the activities of the Chief Construction Engineer and his subordinate units. 3.4. Enter into relationships with departments of third-party institutions and organizations to resolve operational issues of production activities that are within the competence of the Chief Construction Engineer. 4. RESPONSIBILITIES The Chief Construction Engineer is responsible for: 4.1. The results and efficiency of the production activities of the enterprise within its competence. 4.2.

Job description and duties of the chief engineer in construction

On the basis of modern achievements in science and technology, the results of patent research, as well as best practices, taking into account market conditions, organizes work to improve the range and quality, improve and update products, work (services), equipment and technology, and create fundamentally new competitive types of products , for the design and implementation in production of means of integrated mechanization and automation technological processes, control and testing of high-performance specialized equipment, development of standards for the labor intensity of products and norms for the consumption of materials for their manufacture, consistent implementation of the savings regime and cost reduction. 7.
Controls the spending of funds allocated for the purchase of equipment and building materials, compliance with the rules of storage and the quality of conservation of equipment and building materials. 2.11. Carries out work on the delivery, acceptance and commissioning of construction projects. 2.12. Promotes implementation rationalization proposals and improvements that reduce the cost and reduce construction time, reduce payback periods capital investments(without reducing the strength of structures and deteriorating the quality of construction work).
2.13. Ensures the introduction of progressive forms of labor organization, the appropriate use of the professional and qualification potential of employees employed in subordinate units. 2.14. Organizes the work of accounting and reporting on construction. 3. RIGHTS The Chief Construction Engineer has the right to: 3.1.

"APPROVE"
CEO
OOO ____________
"___" _______________

JOB DESCRIPTION
chief engineer
OOO "___________________".

1. General Provisions.

  • 1.1. This job description defines the functional duties, rights and responsibilities of the Chief Engineer
  • 1.2. The chief engineer is appointed to the position and dismissed from the position in accordance with the procedure established by the current labor legislation by order of the General Director.
  • 1.3. Chief Engineer reports directly to CEO.
  • 1.4. A person with a higher technical education and experience is appointed to the position of Chief Engineer managerial work in the relevant field for at least 5 (five) years.
  • 1.5. The chief engineer must be able to use a computer at the level of a confident user, including the ability to use special computer programs.
  • 1.6. The chief engineer must know:
    • laws, decrees, resolutions, orders, orders, other normative and guidance documents relating to the operation of a trade enterprise, construction and repair work;
    • technologies for construction and repair work;
    • rules and requirements for the preparation of documentation for real estate and construction;
    • safety regulations during repair and construction works;
    • labor legislation;
    • Internal labor regulations;
    • rules and norms of labor protection;
    • safety regulations, industrial sanitation and hygiene, fire safety, civil defense.
  • 1.7. The chief engineer must have organizational skills, communication skills, must be energetic and positive.
  • 1.8. During the period of temporary absence of the Chief Engineer, his duties are assigned to ___________________________.

2. FUNCTIONAL RESPONSIBILITIES

2.1. Chief Engineer:

  • 2.1.1. Organizes work on issues included in his functional duties.
  • 2.1.2. Provides technical operation buildings and engineering systems, in accordance with the current regulatory documentation.
  • 2.1.3. Ensures the availability of documentation provided for by regulatory requirements for buildings, premises, equipment of the enterprise.
  • 2.1.4. Ensures timely repair and construction work and the availability, and, if necessary, preparation of the necessary technical documentation to carry out these works.
  • 2.1.5. Organizes the planning of repair and construction works, technical and financial control for the timing, quality of production of repair and construction works.
  • 2.1.6. Accepts new and renovated properties.
  • 2.1.7. Ensures the availability of construction and repair materials, spare parts and other things during the work, controls their rational use.
  • 2.1.8. Plans, coordinates volumes, terms, organizes and ensures timely maintenance.
  • 2.1.9. Monitors and ensures the good condition of elevators, compliance with the rules for their operation and conduct preventive inspections and timely repairs.
  • 2.1.10. Provides daily monitoring of the health of electrical wiring, electrical equipment, uninterrupted power supply, justified and economical use of electricity.
  • 2.1.11. Ensures uninterrupted operation of water supply, heating, sewerage and ventilation equipment at the enterprise. Monitors justified and economical use of water and heat energy.
  • 2.1.12. Develops and submits for approval instructions and proposals for taking measures to improve fire and emergency safety, eliminate safety violations.
  • 2.1.13. Carries out daily (before the opening of the enterprise) control of the readiness of the enterprise for work, including the condition of buildings, premises, equipment.
  • 2.1.14. Informs the General Director about the existing shortcomings in the work of the enterprise, the measures taken to eliminate them.
  • 2.1.15. He observes and controls the observance by employees of labor and production discipline, rules and norms of labor protection, requirements of industrial sanitation and hygiene, requirements of fire, emergency safety, civil defense.
  • 2.1.16. Ensures bringing to the attention of employees and their execution of orders and orders of the administration of the enterprise regarding issues related to the functional duties of the Chief Engineer.
  • 2.1.17. Does not give interviews, does not hold meetings and negotiations related to the activities of the enterprise, without the permission of the General Director of the enterprise.

3. RIGHTS

3.1. The chief engineer has the right:

  • 3.1.1. Give orders and instructions on issues that are part of his functional duties.
  • 3.1.2. Monitor compliance with safety and fire safety regulations by employees of the enterprise and take appropriate measures to eliminate them.
  • 3.1.3. Make suggestions for application disciplinary action impact on employees of the enterprise who allowed gross violations safety and fire safety rules, labor discipline.
  • 3.1.4. Make proposals to the General Director of the enterprise to improve the work of the enterprise.

4. RESPONSIBILITY

4.1. The Chief Engineer is responsible for:

  • 4.1.1. For failure to perform their duties.
  • 4.1.2. For false information about the status of the execution of the received tasks and instructions, violation of the deadlines for their execution.
  • 4.1.3. For failure to comply with orders, instructions of the General Director.
  • 4.1.4. For violation of the Internal Labor Regulations, fire safety and safety regulations established at the enterprise.
  • 4.1.5. For the state of safety and compliance with fire safety rules at the enterprise.
  • 4.1.6. For disclosure of trade secrets.

5. WORKING CONDITIONS

  • 5.1. The mode of operation of the Chief Engineer is determined in accordance with the Internal Labor Regulations established at the enterprise.

Familiarized with the instruction: _______________ _________________

APPROVE:

________________________

[Job title]

________________________

________________________

[Name of company]

________________/[FULL NAME.]/

"____" ____________ 20__

JOB DESCRIPTION

Chief engineer of a construction organization

1. General Provisions

1.1. This job description defines and regulates the powers, functional and job duties, rights and responsibilities of the chief engineer of the construction organization [Organization name in the genitive case] (hereinafter referred to as the Company).

1.2. The chief engineer of a construction organization belongs to the category of managers, is appointed to a position and dismissed in accordance with the procedure established by the current labor legislation by order of the head of the Company.

1.3. The chief engineer of the construction organization reports directly to the head of the Company.

1.4. A person who has:

  • higher professional education in the specialty "Industrial and civil construction", "Construction", "Hydrotechnical construction", "Transport construction", "Urban construction and economy" or higher professional technical education and professional retraining towards professional activity;
  • at least 5 years of work experience in the field of professional activity;
  • advanced training at least once every 5 years and the availability of a qualification certificate for compliance with the position held.

1.5. The chief engineer of a construction organization must know:

  • laws and other regulatory legal acts of the Russian Federation regulating the production, economic and financial and economic activities of a construction organization;
  • administrative, methodological and regulations defining priority areas development of the economy and urban planning activities;
  • activities of a construction organization;
  • profile, specialization and features of the structure of the construction organization;
  • prospects for technical, economic and social development urban planning activities and business plan of a construction organization;
  • production capacity;
  • technology construction industry construction organization;
  • the procedure for drawing up and coordinating plans for production and economic activities;
  • market methods of managing and managing a construction organization;
  • the procedure for concluding and executing economic and financial contracts;
  • scientific and technical achievements in urban planning and the experience of leading construction organizations;
  • economics and organization of production, labor and management;
  • fundamentals of environmental legislation;
  • fundamentals of labor legislation;
  • labor protection rules.

1.6. The chief engineer of a construction organization in his activities is guided by:

  • local acts and organizational and administrative documents of the Company;
  • internal labor regulations;
  • rules of labor protection and safety, ensuring industrial sanitation and fire protection;
  • instructions, orders, decisions and instructions of the immediate supervisor;
  • this job description.

1.7. During the period of temporary absence of the chief engineer of the construction organization, his duties are assigned to [name of the position of the deputy], who is appointed in accordance with the established procedure, acquires the relevant rights and is responsible for failure to perform or improper performance of the duties assigned to him in connection with the replacement.

2. Job responsibilities

The chief engineer of the construction organization performs the following duties:

2.1. Determines the technical policy and directions of technical development of a construction organization in a market economy, ways of reconstruction and technical re-equipment of existing production, the level of specialization and diversification of production in the future.

2.2. Provides the necessary level of technical preparation of production and its constant growth, increasing production efficiency and labor productivity, reducing costs (material, financial, labor), rational use of production resources, high quality and competitiveness construction products, works or services, conformity of manufactured products current standards, technical conditions and requirements of technical aesthetics, as well as their reliability and durability.

2.3. In accordance with the approved business plans of the organization for the medium and long term, manages the development of measures for the reconstruction and modernization of the organization, the prevention of the harmful effects of production on the environment, the careful use natural resources, creating safe working conditions and improving the technical culture of production.

2.4. Organizes the development and implementation of implementation plans new technology and technology, carrying out organizational and technical measures, research and development work.

2.5. Ensures the effectiveness of design solutions, timely and high-quality preparation of production, technical operation, repair and modernization of equipment, achievement High Quality products during their development and production.

2.6. On the basis of modern achievements in science and technology, the results of patent research, as well as best practices, taking into account market conditions, organizes work to improve the range and quality, improve and update construction products, work (services), equipment and technology, and create fundamentally new competitive types of products , on the design and implementation in production of means of integrated mechanization and automation of technological processes, control and testing of high-performance specialized equipment, development of labor intensity standards for products and consumption rates of materials for their manufacture, consistent implementation of the savings regime and cost reduction.

2.7. Carries out control over compliance with design, engineering and technological discipline, labor protection and fire safety rules, requirements of environmental, sanitary authorities, as well as bodies exercising technical supervision.

2.8. Ensures timely preparation of technical documentation (drawings, specifications, specifications, technological maps).

2.9. Concludes with research, design (design and technology) organizations and higher educational institutions contracts for the development of new equipment and production technology, projects for the reconstruction of the organization, its divisions, renovation and modernization of equipment, integrated mechanization and automation of production processes, automated systems production management, oversees their development, organizes the review and implementation of technical re-equipment projects developed by third-party organizations, drawing up applications for the purchase of equipment on a leasing basis.

2.10. Coordinates work on issues of patent and invention activities, unification, standardization and certification of products, attestation and rationalization of jobs, metrological support, mechanical and energy maintenance of production.

2.11. Takes measures to improve the organization of production, labor and management based on the introduction of the latest technical and telecommunication means for engineering and management work.

2.12. Organizes the scientific research and experiments, testing new equipment and technology, as well as work in the field of scientific and technical information, rationalization and invention, dissemination of advanced production experience.

2.13. Carries out work to protect the priority of implemented scientific and technical solutions, prepare materials for their patenting, obtain licenses and intellectual property rights.

2.14. Organizes training and advanced training of workers and engineers and ensures continuous improvement of personnel training.

2.15. Manages activities technical services organization, controls the results of their work, the state of labor and production discipline in subordinate units.

2.16. He is the first deputy director of the organization and is responsible for the results and efficiency of the production

In case of official necessity, the chief engineer of a construction organization may be involved in the performance of his official duties overtime, in the manner prescribed by the provisions of federal labor legislation.

3. Rights

The chief engineer of a construction organization has the right to:

3.1. Participate in the discussion of draft decisions of the head of the company.

3.2. Dispose of the financial resources and property entrusted to him in compliance with the requirements determined by legislative and regulatory legal acts, the charter of the organization.

3.3. Sign and endorse documents within their competence.

3.4. Initiate and hold meetings on organizational, financial and economic issues.

3.6. Conduct quality and timeliness checks on assignments.

3.7. Demand the termination (suspension) of work (in case of violations, non-compliance with established requirements, etc.), compliance with established norms, rules, instructions; give instructions for correcting deficiencies and eliminating violations.

3.8. Submit to the head of the company representations on the admission, transfer and dismissal of employees, on the promotion of distinguished employees and on the application of disciplinary sanctions to employees who violate labor discipline.

3.9. Participate in the discussion of issues related to their official duties.

3.10. Require the head of the company to assist in the performance of their duties and rights.

4. Responsibility and performance evaluation

4.1. The chief engineer of a construction organization bears administrative, disciplinary and material (and in some cases provided for by the legislation of the Russian Federation - and criminal) responsibility for:

4.1.1. Non-fulfillment or improper fulfillment of official instructions of the immediate supervisor.

4.1.2. Failure or improper performance of labor functions and the tasks assigned to him.

4.1.3. Unlawful use of the granted official powers, as well as their use for personal purposes.

4.1.4. Inaccurate information about the status of the work entrusted to him.

4.1.5. Failure to take measures to suppress the identified violations of safety regulations, fire and other rules that pose a threat to the activities of the enterprise and its employees.

4.1.6. Failure to enforce labor discipline.

4.2. Evaluation of the work of the chief engineer of a construction organization is carried out:

4.2.1. The immediate supervisor - regularly, in the course of the daily implementation by the employee of his labor functions.

4.2.2. Attestation Commission of the enterprise - periodically, but at least once every two years based on the documented results of the work for the evaluation period.

4.3. The main criterion for evaluating the work of the chief engineer of a construction organization is the quality, completeness and timeliness of his performance of the tasks provided for by this instruction.

5. Working conditions

5.1. The work schedule of the chief engineer of a construction organization is determined in accordance with the internal labor regulations established by the Company.

5.2. In connection with production necessity the chief engineer of a construction organization is obliged to travel to business trips(including local values).

5.3. To resolve operational issues related to the provision of production activities, the chief engineer of a construction organization may be allocated a service vehicle.

6. Right to sign

6.1. To ensure its activities, the chief engineer of a construction organization is granted the right to sign organizational and administrative documents on issues referred to his competence by this job description.

Familiarized with the instructions ____ / ____________ / "__" _______ 20__



















CHIEF ENGINEER JOB DESCRIPTION

1. GENERAL PROVISIONS
1.1. This job description defines the functional duties, rights and responsibilities of the Chief Construction Engineer.
1.2. The chief construction engineer is appointed to the position and dismissed in accordance with the procedure established by the current labor legislation by order of the director of the enterprise.
1.3. The chief construction engineer reports directly to the director of the enterprise.
1.4. A person who has a higher professional (technical) education and at least _______ years of experience in management positions in the field of construction is appointed to the position of Chief Construction Engineer.
1.5. The Chief Civil Engineer must know:
legislation and other regulatory legal acts regulating the activities of construction organizations; profile, specialization and features of the structure of the enterprise; technical and economic development enterprises; production capacity of the enterprise; basics of work technology; procedure for the development and approval of construction plans; technology and methods of construction work; building regulations; requirements for the organization of labor in the production building objects; the procedure for financing capital investments and attracting investors; the procedure for the development and execution of design estimates and other technical documentation, keeping records and compiling reports on the activities of the enterprise in the field of construction; the procedure for concluding and executing economic and financial contracts; scientific and technical achievements and experience of advanced enterprises in the field of construction; economics, organization of production, labor and management; rules and norms of labor protection, safety measures, industrial sanitation and fire protection.
1.6. During the period of temporary absence of the Chief Engineer for Construction, his duties are assigned to ____________________________.
2. FUNCTIONAL RESPONSIBILITIES
Chief Construction Engineer:
2.1. Ensures the performance of construction work, targeted and rational use of resources.
2.2. He leads the work to improve and reduce the cost of design and survey work, improve the organization of production and introduce progressive construction methods, reduce the cost of construction work and improve quality, as well as reduce the time for their implementation.
2.3. Leads the development of promising and current plans construction, reconstruction, as well as plans for the commissioning of construction projects.
2.4. Participates in the preparation of business plans in terms of technical re-equipment and increase in production efficiency, in determining the necessary financial resources, including funds from investors, for the construction, design and purchase of equipment, as well as sources of financing for capital investments, contractors for capital construction work in the conditions of market methods of managing.
2.5. Takes measures for the timely conclusion of economic and financial contracts with contractors for design and survey and construction and installation work, with enterprises for the purchase of materials and equipment.
2.6. Monitors the fulfillment by counterparties of obligations under contracts, participates in the preparation of claims in case of improper fulfillment of obligations.
2.7. Provides the availability of all the necessary information for the development of design estimates and materials for construction projects.
2.8. Provides control over compliance with the requirements of environmental protection legislation, as well as technical supervision and control over the timing and quality of all construction and installation and other construction works, over their compliance with the approved design and estimate documentation, building codes, rules, standards and specifications, safety standards, industrial sanitation and fire protection, labor organization requirements.
2.9. Coordinates with the bodies exercising technical supervision on issues related to the installation, testing and registration of equipment at construction sites.
2.10. Controls the spending of funds allocated for the purchase of equipment and building materials, compliance with storage rules and the quality of conservation of equipment and building materials.
2.11. Carries out work on the delivery, acceptance and commissioning of construction projects.
2.12. Promotes the introduction of rationalization proposals and improvements that reduce the cost and reduce construction time, reduce the payback period for capital investments (without reducing the strength of structures and deteriorating the quality of construction work).
2.13. Ensures the introduction of progressive forms of labor organization, the appropriate use of the professional and qualification potential of employees employed in subordinate units.
2.14. Organizes the work of accounting and reporting on construction.
3. RIGHTS
The chief construction engineer has the right to:
3.1. To give instructions to subordinate employees and services, tasks on a range of issues included in his functional duties.
3.2. To control the fulfillment of planned tasks and works, the timely execution of individual orders and tasks by subdivisions subordinate to him.
3.3. Request and receive the necessary materials and documents related to the activities of the Chief Construction Engineer and his subordinate units.
3.4. Enter into relationships with departments of third-party institutions and organizations to resolve operational issues of production activities that are within the competence of the Chief Construction Engineer.
4. RESPONSIBILITY
The Chief Civil Engineer is responsible for:
4.1. The results and efficiency of the production activities of the enterprise within its competence.
4.2. Failure to ensure the fulfillment of their functional duties, as well as the work of subordinate departments of the enterprise on issues of their production activities.
4.3. Inaccurate information about the status of implementation of work plans on issues within its competence.
4.4. Failure to comply with orders, orders and instructions from the administration of the enterprise.
4.5. Failure to take measures to suppress the identified violations of safety regulations, fire and other rules that pose a threat to the activities of the enterprise and its employees.
5. WORKING CONDITIONS
5.1. The work schedule of the Chief Construction Engineer is determined in accordance with the Internal Labor Regulations established at the enterprise.
5.2. Due to production needs, the Chief Construction Engineer may go on business trips (including local ones).
5.3. To resolve operational issues related to the provision of production activities, the Chief Engineer for Construction may be provided with official vehicles.
6. SCOPE AND IMPACT OF DECISIONS
6.1. To ensure his activities, the chief engineer for construction is given the right to sign organizational and administrative documents on issues that are part of his functional duties.

CHIEF ENGINEER JOB DESCRIPTION

CHIEF ENGINEER

I. GENERAL PROVISIONS
1.1. The chief engineer belongs to the category of managers, is hired and dismissed by order.
1.2. A person who has a higher professional (technical) education and at least 5 years of professional experience in managerial positions in the corresponding profile of the enterprise in the sector of the economy is appointed to the position of chief engineer.
1.3. The chief engineer reports directly to the director of the enterprise.
1.4. In his work, the chief engineer is guided by:
- regulatory legal acts that consider issues of production and economic and financial and economic activities of the enterprise;
- methodological and normative materials, orders (instructions) of higher authorities on issues of the economy and the relevant industry;
- the charter of the enterprise;
- orders, instructions of the director of the enterprise;
- this job description.
1.5. The chief engineer must know:
- legislative and regulatory legal acts regulating the production and economic and financial and economic activities of the enterprise, resolutions of federal, regional and local authorities state power and management that determine the priority areas for the development of the economy and the relevant industry;
- organizational and administrative documents and regulatory materials of other bodies related to the activities of the enterprise;
- profile, specialization and features of the structure of the enterprise;
- prospects for the technical, economic and social development of the industry and the business plan of the enterprise;
— production capacities of the enterprise;
- production technology of the company's products;
- the procedure for drawing up and agreeing on plans for the production and economic activities of the enterprise;
- market methods of managing and managing an enterprise;
– the procedure for concluding and executing economic and financial contracts;
- scientific and technical achievements in the relevant industry and the experience of advanced enterprises;
— economics and organization of production, labor and management;
— fundamentals of environmental legislation;
— basics of labor legislation;
- rules and regulations of labor protection.
1.6. During the absence of the chief engineer, his duties are performed in accordance with the established procedure by the appointed deputy, who is fully responsible for their proper performance.
II. FUNCTIONS
The chief engineer of the enterprise is assigned the following functions:
2.1. Ensuring the technical preparation of the enterprise.
2.2. Implementation of the relationship with research, design (design and technology) organizations and higher educational institutions.
2.3. Management of research work.
2.4. Organization of training and advanced training of workers and engineering and technical workers.
2.5. Control over compliance with design, engineering and technological discipline, rules and regulations on labor protection and safety.
III. JOB DUTIES
To perform the functions assigned to him, the chief engineer of the enterprise must:
3.1. Determine the technical policy and directions of technical development of the enterprise in a market economy, ways of reconstruction and technical re-equipment of existing production, the level of specialization and diversification of production in the future.
3.2. Ensure the necessary level of technical preparation of production and its constant growth, increase production efficiency and labor productivity, reduce costs (material, financial, labor), rational use of production resources, high quality and competitiveness of products, works or services, compliance of manufactured products with current state standards, technical specifications and the requirements of technical aesthetics, as well as their reliability and durability.
3.3. In accordance with the approved business plans of the enterprise for the medium and long term, manage the development of measures for the reconstruction and modernization of the enterprise, the prevention of the harmful effects of production on the environment, the careful use of natural resources, the creation of safe working conditions and the improvement of the technical culture of production.
3.4. Organize the development and implementation of plans for the introduction of new equipment and technology, organizational and technical measures, research and development work.
3.5. Ensure the effectiveness of design solutions, timely and high-quality preparation of production, technical operation, repair and modernization of equipment, achievement of high quality products in the process of its development and production.
3.6. On the basis of modern achievements in science and technology, the results of patent research, as well as best practices, taking into account market conditions, organize work to improve the range and quality, improve and update products, work (services) performed, equipment and technology, create fundamentally new competitive types of products, design and introduction into production of means of integrated mechanization and automation of technological processes, control and testing of high-performance specialized equipment, development of labor intensity standards for products and norms for the consumption of materials for their manufacture, consistent implementation of a savings regime and cost reduction.
3.7. Monitor compliance with design, engineering and technological discipline, rules and regulations on labor protection, safety, industrial sanitation and fire safety, the requirements of environmental, sanitary authorities, as well as bodies exercising technical supervision.
3.8. Ensure timely preparation of technical documentation (drawings, specifications, technical conditions, technological maps).
3.9. Conclude agreements with research, design (design and technological) organizations and higher educational institutions for the development of new equipment and production technology, projects for the reconstruction of the enterprise, its divisions, renovation and modernization of equipment, integrated mechanization and automation of production processes, automated production control systems, exercise control over their development, organize the consideration and implementation of technical re-equipment projects developed by third-party organizations, the preparation of applications for the purchase of equipment on a leasing basis.
3.10. Coordinate work on issues of patent and inventive activities, unification, standardization and certification of products, certification and rationalization of jobs, metrological support, mechanical and energy maintenance of production.
3.11. Take measures to improve the organization of production, labor and management based on the introduction of the latest technical and telecommunication means for performing engineering and management work.
3.12. Organize the conduct of scientific research and experiments, testing of new equipment and technology, as well as work in the field of scientific and technical information, rationalization and invention, and the dissemination of advanced production experience.
3.13. Carry out work to protect the priority of implemented scientific and technical solutions, prepare materials for their patenting, obtain licenses and intellectual property rights.
3.14. Organize training and advanced training of workers and engineers and technicians and ensure continuous improvement of personnel training.
3.15. Manage the activities of the technical services of the enterprise, monitor the results of their work, the state of labor and production discipline in subordinate units.
3.16. Being the first deputy director of the enterprise, be responsible for the results and efficiency of production activities.
IV. RIGHTS
4.1. Represent the interests of the technical services of the enterprise in relations with other structural divisions of the enterprise, other organizations and public authorities.
4.2. Submit proposals to improve the activities of the enterprise (department) for consideration by the management.
4.3. Sign and endorse documents within their competence, issue orders under their signature on the enterprise on issues of production activities.
4.4. Interact with the heads of all (individual) services on issues within its competence.
4.5. Receive from the heads of structural divisions of the enterprise and specialists information and documents necessary for the performance of their duties.
4.6. Check the activities of the structural divisions of the enterprise in the field of technical preparation of production.
4.7. Participate in the preparation of orders, instructions, instructions, estimates, contracts and other documents related to the production activities of the enterprise.
4.8. Require the management of the enterprise to assist in the performance of their duties and rights.
V. RESPONSIBILITY
The Chief Engineer is responsible for:
5.1. For failure to perform (improper performance) of their official duties provided for by this job description, to the extent determined by the current labor legislation of the Russian Federation.
5.2. For offenses committed in the course of carrying out their activities - within the limits determined by the current administrative, criminal and civil legislation of the Russian Federation.
5.3. For causing material damage- within the limits determined by the current labor, civil legislation.
The job description was developed in accordance with ________________________
(name, number and date of the document)
Head of the structural unit __________________________________
(signature) (signature transcript)
00.00.00
AGREED:
Head of the legal department


00.00.00
Familiarized with the instructions:
_____________________________
(signature) (signature transcript)
00.00.00


Alexander Lozhechkin, Head of Solutions Architecture at AWS EMEA Emerging Markets, says on his Facebook page. The editors of vc.ru publish the text with the permission of the author. Successfully passing an interview at Amazon is very difficult. Still work though...

Sberbank President German Gref believes that the learning process at school "kills every desire to learn." He stated this at the Eastern Economic Forum, RIA Novosti reports. Gref said that he, in particular, does not like the process of assessment and exams: “I ...

Chief project engineer (construction organizer)

Sample job description for the chief engineer of the project (construction organizer)

A sample job description is drawn up taking into account the professional standard

1. General Provisions

1.1. The chief engineer of the project (construction organizer) belongs to the category of managers.

1.2. The following person is accepted for the position of Chief Project Engineer:

1) having higher education in the direction of training in the field of construction;

2) who has mastered additional vocational education - advanced training programs;

3) having at least ten years of work experience in the profile of professional activity in the field of construction.

4) having at least three years of work experience in organizations engaged in construction, reconstruction, overhaul of capital construction facilities in engineering positions.

1.3. The chief engineer of the project (construction organizer) must know:

1) the requirements of the legislation of the Russian Federation for the composition, content and execution of project documentation;

2) requirements of technical documentation for the organization of construction production;

3) the composition and procedure for preparing documents for issuing permits and permits for construction production;

4) technologies for the production of various types of construction work;

5) features of construction production at hazardous, technically complex and unique capital construction projects;

6) the requirements of the legislation of the Russian Federation for the arrangement and preparation of construction sites (on-site preparatory work);

7) ways and methods of planning construction production ( network planning, scheduling, project planning, master planning);

8) requirements of the legislation of the Russian Federation in the areas of labor protection, fire safety, environmental protection;

9) labor protection and fire safety requirements in the course of construction works;

10) basic sanitary rules and norms applied in the course of construction works;

11) the main harmful and (or) dangerous production factors;

12) types of negative impact on the environment during various types of construction work and methods for minimizing and preventing them;

13) requirements for workplaces and the procedure for organizing and conducting special evaluation working conditions;

14) rules for maintaining documentation on monitoring compliance with the requirements of labor protection, fire safety and environmental protection;

15) regulatory and design indicators the needs of construction production in material and technical resources (by types of material and technical resources);

16) types and properties of basic building materials, products and structures;

17) types and characteristics of the main construction machines, mechanisms, power plants, vehicles;

18) methods of consolidated planning for the supply, distribution and expenditure of various types of material and technical resources;

19) order documentation applications for various types of material and technical resources;

20) rules for insurance of various types of material and technical resources;

21) rules for acceptance and documentation material assets;

22) the composition and classification of costs for the creation and storage of a stock of material assets;

23) the procedure for calculating the costs associated with losses (damage, obsolescence) of material resources;

24) the procedure for compiling reporting documentation on the use of material assets (sheets of expenditure and write-off of material assets);

25) the procedure for filing applications for construction machinery, equipment and technological equipment;

26) types and characteristics of technological equipment used in various types construction works;

27) requirements of the legislation of the Russian Federation to the rules for the maintenance and operation of machinery and equipment;

28) requirements of technical documentation for the organization of construction production at the construction site;

29) requirements for structural elements of the building (premises) and common property of multi-apartment residential buildings, due to the need for their accessibility and compliance with the special needs of people with disabilities;

30) the requirements of the legislation of the Russian Federation for project documentation, for the procedure for carrying out and technologies for the production of construction work;

31) technologies for the production of construction works;

32) the procedure for economic and financial relations of the construction organization with customers and contractors;

33) ways and methods of operational management of construction production (project management, network planning, scheduling, project planning, master planning);

34) methods for determining the types and volumes of construction work and production tasks;

35) rules for maintaining executive and accounting documentation of construction production;

36) the requirements of the legislation of the Russian Federation for the procedure and documentation of the acceptance and transfer of completed capital construction projects and stages (complexes) of work;

37) the requirements of the construction contract for the specification of the object, the procedure for the delivery and acceptance of the completed capital construction object and the stages (complexes) of work, the availability of accompanying documentation and the deadlines for the delivery of work;

38) the grounds and procedure for making a decision on the conservation of an unfinished capital construction object;

39) rules for documenting the acceptance and transfer of completed capital construction projects and stages (complexes) of work;

40) rules for documenting the conservation of an unfinished capital construction object;

41) the requirements of the legislation of the Russian Federation, as well as the construction contract for the condition of the capital construction object transferred to the customer; the requirements of the legislation of the Russian Federation in the field of technical regulation in construction;

42) requirements of the legislation of the Russian Federation for the performance of construction works;

43) requirements of technical documentation for the procedure for acceptance of concealed works and building structures that affect the safety of the capital construction object;

44) rules for the implementation of work and construction control measures;

45) means and methods of documentary and instrumental control of compliance with technological processes and results of construction work;

46) methods for eliminating the causes of defects in construction works (the use of alternative construction technologies, advanced training of employees);

47) rules for maintaining executive and accounting documentation of construction control measures;

48) rules for reporting on the types and stages of construction work performed;

49) requirements of the legislation of the Russian Federation in the field of technical regulation in construction;

50) the basics of the quality management system and the features of its implementation in the construction industry;

51) the procedure for the development and execution of local regulatory technical documents(standards of the organization);

52) means and methods of documentary and instrumental assessment of compliance with the requirements of the organization's standards;

53) the main methods of metrological support for instrumental assessment of compliance with the requirements of the organization's standards;

54) methods of technical and economic analysis and evaluation of the main indicators of production and economic activity;

55) methods for identifying reserves to improve the efficiency of construction work;

56) means and methods of organizational and technological optimization of construction works;

57) modern achievements in the field of building production and building materials industry;

58) the main requirements of the labor legislation of the Russian Federation, the rights and obligations of employees;

59) methods for calculating the needs of construction production in labor resources;

60) internal labor regulations, job descriptions, employment contracts;

61) methods and means of managing labor collectives;

62) the principles of distribution of the functions of organization and management, methods of collective management of the processes of construction production;

63) types of documents confirming professional qualification and access to certain types works;

64) basic methods for assessing labor efficiency;

65) grounds for bringing to responsibility and measures of administrative and criminal liability for violation of the labor legislation of the Russian Federation;

66) ……… (other documents, materials, etc.)

1.4. The chief project engineer (construction organizer) must be able to:

1) check the completeness and quality of design documentation, assess the compliance of the technical information contained in it with the requirements of regulatory technical documentation;

2) apply normative-technical and project documentation when planning and distributing production resources;

3) prepare documents for issuing permits and permits for construction work at the construction site, including in protected areas;

4) develop plans (network, object, calendar) of construction production;

5) to make calculations of compliance of volumes of production of construction works with regulatory requirements for labor and material and technical resources;

6) determine the composition and scope of auxiliary work to create the infrastructure of the construction site (communication and dispatching facilities, transport communications and engineering networks, amenity premises);

7) determine jobs that are under the influence of harmful and (or) dangerous factors in the production of construction work and use construction equipment;

8) determine the list of works to ensure the safety of the construction site (fencing of construction sites, fencing or designation of hazardous areas, lighting, provision of fire extinguishing equipment, emergency communications and signaling);

9) determine the list necessary funds collective and (or) personal protection construction site workers;

10) determine the list of necessary measures to provide workers of the construction site with household and sanitary and hygienic premises;

11) to carry out and control documentary support of the results of monitoring the implementation of labor protection, fire safety and environmental protection requirements, industrial safety requirements;

12) determine the range and calculate the volumes (quantity) and the schedule for the supply of material and technical resources in accordance with the construction production plans;

13) develop schedules for the supply, operation, maintenance, repair of construction equipment, machines and mechanisms in accordance with the construction production plans;

14) determine required list and the volume of resources supplied through external engineering networks (water, electricity, heat) in accordance with the construction production plans;

15) plan the supply and control of the distribution and expenditure of material and technical resources at the construction site;

16) draw up and check applications for material and technical resources, construction equipment, machines and mechanisms, resources supplied through external engineering networks;

17) to carry out documentary, visual and instrumental quality control and volumes (quantity) of supplied material and technical resources, construction equipment, machines and mechanisms, resources supplied through external engineering networks;

18) plan and control the performance of work by contractors carrying out Maintenance and repair of construction machinery, equipment, technological equipment;

19) perform and check the calculations of spending funds to provide construction production with material and technical resources;

20) develop and control the implementation of master plans for construction production at the construction site;

21) determine the types and complexity, calculate the volume of construction work and production tasks in accordance with the available material and technical resources, the specialization of contractors, the specialization and qualifications of the construction site workers;

22) to carry out documentary support of construction production;

23) establish the reasons for the deviation of technological processes from the requirements of regulatory technical documentation, specifications, technological maps, workflow maps;

24) establish the reasons for deviations of the results of construction work from the requirements of regulatory technical and design documentation;

25) to carry out documentary support of works and measures of construction control;

26) to carry out documentary support of works and measures of acceptance control of completed types and stages of construction works (capital construction projects, elements, structures and parts of capital construction facilities, engineering networks);

27) develop executive and technical documentation for completed capital construction projects, stages (complexes) of work, conservation of unfinished capital construction projects;

28) take measures to ensure that the results of construction work comply with the requirements of sanitary and hygienic standards and the terms of the construction contract (cleanliness, absence of excess materials, technical condition);

29) analyze and summarize the experience of construction production;

30) develop local regulatory technical documents (standards of the organization) in the field of organization of construction production;

31) assess the compliance of the processes and results of construction production with the requirements of local regulatory technical documents (organization standards);

32) carry out a technical and economic analysis of production and economic activities at the construction site;

33) to analyze the effectiveness of the use of production resources;

34) develop and plan activities to improve the efficiency of the use of production resources;

35) carry out a technical and economic analysis of the results of the introduction of new methods and forms of labor organization, rationalization proposals, the introduction of new equipment and technologies, mechanization and automation of construction work, optimization of the use of resources;

36) determine the required number, professional and qualification composition of employees in accordance with production assignments and calendar plans construction production at the construction site;

37) to find optimal structure distribution of workers to carry out the processes of construction production;

38) evaluate the effectiveness and quality of performance by the managers of work production sites (capital construction facilities), individual work production sites of production tasks, official (functional) duties;

39) evaluate psychological climate in the workforce and its impact on the performance of production tasks;

40) determine the missing competencies of the heads of work sites;

41) ……… (other skills and abilities)

1.5. The chief engineer of the project (construction organizer) in his activities is guided by:

1) ……… (name of constituent document)

2) Regulations on ……… (name of the structural unit)

3) this job description;

4) ……… (names of local regulations governing labor functions by position)

1.6. The chief engineer of the project (construction organizer) reports directly to ……… (title of the position of the head)

1.7. The chief engineer of the project (construction organizer) manages ……… (name of the structural unit)

1.8. During the absence of the project manager (vacation, temporary disability, etc.), his duties are performed by a deputy (an employee appointed in accordance with the established procedure, who acquires the relevant rights and is responsible for failure to perform or improper performance of the duties assigned to him in connection with the replacement).

1.9. ……… (other general provisions)

2. Labor functions

2.1. Organization of construction production at the construction site (capital construction facilities):

1) preparation of construction production at the construction site;

2) material and technical support of construction production at the construction site;

3) operational management construction production at the construction site;

4) acceptance and quality control of the results of the performed types and stages of construction work at the construction site;

5) delivery to the customer of the results of construction work;

6) implementation of a quality management system at the construction site;

7) development of measures to improve the efficiency of production and economic activities at the construction site;

8) management of construction site workers.

2.2. Supervision of subordinate employees.

2.3. ……… (other functions)

3. Job responsibilities

3.1. The chief project engineer (construction organizer) performs the following duties:

3.1.1. As part of the labor function, the preparation of construction production at the construction site:

1) organizes the input control of project documentation for the construction site, the organization of input control of project documentation for capital construction projects;

2) draws up permits and permits necessary for the performance of construction work at the construction site;

3) carries out planning and control of the implementation of the preparation and equipment of the construction site;

4) carry out planning of construction production at the construction site in accordance with the requirements of labor protection, fire safety and environmental protection.

5) exercise control over the implementation of measures at the construction site for briefing and compliance by employees with the requirements of labor protection, fire safety and environmental protection;

6) carries out planning and control of the preparation of production areas, work sites and workplaces for a special assessment of working conditions;

3.1.2. As part of the labor function, the logistics of construction production at the construction site:

1) determines the need for construction production at the construction site in material and technical resources;

2) carries out integrated planning of supply and control of distribution, storage and expenditure of material and technical resources at the construction site (capital construction facilities and individual areas of work);

3) determine the list of construction equipment, machines and mechanisms required for the implementation of construction production;

4) carry out a consolidated planning of the supply, operation, maintenance and repair of construction equipment, machines and mechanisms at the construction site (capital construction facilities and individual areas of work);

5) determines the need for construction production in resources supplied through external engineering networks (water, electricity, heat);

6) carries out a consolidated supply planning and control of the distribution and expenditure of resources supplied through external engineering networks to the construction site (capital construction facility and individual work production sites);

7) carries out incoming quality control and volumes (quantity) of supplied material and technical resources, construction equipment, machines and mechanisms, resources supplied through external engineering networks;

8) exercise control over the expenditure of funds for the material and technical support of construction production.

3.1.3. As part of the labor function, operational management of construction production at the construction site:

1) carries out operational planning, coordination, organization and conduct of construction control in the process of construction, reconstruction, overhaul of capital construction facilities;

2) coordinates the processes of construction production at the construction site;

3) develops, plans and monitors the implementation of operational measures aimed at correcting defects in the results of construction work at the construction site;

4) maintains the current and executive documentation on the production activities of the construction site.

3.1.4. As part of the labor function, acceptance and quality control of the results of the performed types and stages of construction work at the construction site:

1) carries out planning and control of the performance of work and construction control measures;

2) carries out the development, planning and control of the implementation of measures aimed at preventing and eliminating the causes of deviations in the results of construction work from the requirements of regulatory technical, technological and project documentation;

3) carries out acceptance of completed types and individual stages of construction, reconstruction, overhaul capital construction objects, elements, structures and parts of capital construction objects, engineering and technical support networks, their sections with the right to sign the relevant documents;

4) maintains the established reporting on the performed types and stages of construction work;

5) introduce and improve the quality management system of construction production.

3.1.5. As part of the labor function, the delivery of the results of construction work to the customer:

1) carries out planning and control of the performance of work and measures to prepare for the delivery to the customer of the results of construction work (completed capital construction projects, stages (complexes) of work, conservation of unfinished capital construction projects);

2) prepares as-built technical documentation to be submitted to the acceptance committees;

3) presents the results of construction work to the acceptance commissions;

4) signs the act of acceptance of the capital construction object;

5) signs a document confirming the compliance of the constructed, reconstructed capital construction facility with the requirements of technical regulations;

6) signs a document confirming the compliance of the parameters of the constructed, reconstructed capital construction facility with the project documentation, including the requirements for energy efficiency and the requirements for equipping the capital construction facility with metering devices for the energy resources used;

7) signs a document confirming the compliance of the constructed, reconstructed capital construction facility with the technical conditions for connection (technological connection) to engineering and technical support networks (if any);

3.1.6. As part of the labor function, the implementation of a quality management system at the construction site:

1) carries out planning and control of the performance of work and measures for the implementation of the quality management system of construction production;

2) analyzes and evaluates the effectiveness of the implementation of the quality management system of construction production;

3) optimizes construction production based on the requirements and recommendations of the quality management system.

3.1.7. As part of the labor function, the development of measures to improve the efficiency of production and economic activities at the construction site:

1) determine the main reserves of construction production, carry out planning and control over the implementation of measures to improve the efficiency of production and economic activities and labor productivity at the construction site;

2) carries out planning and control of the performance of work and measures for the introduction of new technologies in construction production, ensuring an increase in the efficiency of production and economic activities at the construction site;

3) evaluates the results of work and activities aimed at improving the efficiency of production and economic activities at the construction site.

3.1.8. As part of the labor function, management of the construction site employees:

1) determines the needs of construction production at the construction site in labor resources;

2) performs the placement of workers at the construction site (capital construction facilities and individual work sites);

3) exercise control over the performance and operational management of the performance by the heads of work production sites of their functional (official) duties.

3.1.10. As part of the labor function of managing subordinate employees:

1) distributes labor functions, job assignments between subordinate employees and exercises control over their implementation;

2) provides subordinate employees with advisory support, gives explanations and instructions in the framework of the performance of labor functions by subordinate employees;

3) ensures compliance with labor legislation and legislation on labor protection in relation to subordinate employees, creation of working conditions that meet the established requirements;

4) resolve conflict situations between subordinate employees;

5) submits for consideration ……… (name of the position of the head) submissions on the admission, transfer and dismissal of employees; proposals for their promotion or the imposition of penalties on them;

6) ……… (other duties)

3.1.11. As part of the performance of their labor functions:

1) carry out the instructions of his immediate supervisor;

2) undergo periodic medical examinations (examinations), as well as extraordinary medical examinations (examinations) in accordance with the procedure established by the legislation of the Russian Federation.

3.1.12. ……… (other duties)

3.2. ……… (other job descriptions)

4. Rights

The chief project engineer (construction organizer) has the right to:

4.1. Participate in the discussion of draft decisions of the organization's management, in meetings on their preparation and implementation.

4.2. Sign and endorse ……… (types of documents)

4.3. Initiate and conduct meetings on the organization of procurement and control over their implementation.

4.4. Request and receive from structural divisions, specialists the necessary information, documents.

4.5. Conduct quality and timeliness checks on assignments.

4.6. Demand the termination (suspension) of work (in case of violations, non-compliance with established requirements, etc.), compliance with established standards; give instructions for correcting deficiencies and eliminating violations.

4.7. Get acquainted with the draft decisions of the management regarding the function performed by him, with documents defining his rights and obligations in his position, criteria for assessing the quality of the performance of his labor functions.

4.8. Participate in the discussion of issues related to their official duties.

4.9. Require the management of the organization to assist in the performance of his duties and rights.

4.10. ……… (other rights)

5. Responsibility

5.1. The chief project engineer (construction organizer) is held responsible for:

For improper performance or non-performance of their official duties provided for by this job description - in the manner established by the current labor legislation of the Russian Federation;

For offenses and crimes committed in the course of their activities - in the manner prescribed by the current administrative, criminal and civil legislation of the Russian Federation;

For causing damage to the organization - in the manner prescribed by the current labor legislation of the Russian Federation.

5.2. ……… (other liability provisions)

6. Final provisions

6.1. This job description has been developed on the basis of professional standard"", approved by the Order of the Ministry of Labor and social protection Russian Federation dated June 26, 2017 N 516n, taking into account ... ... ... (details of the organization's local regulations)

6.2. Familiarization of the employee with this job description is carried out upon employment (before signing the employment contract).

The fact that the employee is familiarized with this job description is confirmed by ……… (signature on the familiarization sheet, which is an integral part of this instruction (in the journal of familiarization with job descriptions); in a copy of the job description kept by the employer; otherwise)

6.3. ……… (other final provisions).